Grand Glaize Force Main

Owner: Metropolitan St. Louis Sewer District

M3 Engineering designed a pump station and force main over an existing levee at the Grand Glaize WWTP. During wet weather, the collection system approaching the plant would surcharge and overflow, requiring portable pumping from an upstream manhole to a lagoon. The new system allows flow to be automatically diverted into the lagoon. M3 performed hydraulic analysis, plan and specification preparation and cost estimating. Plans and specifications were prepared according to MSD guidelines.

Projects - Waste Water