Deer Creek Watershed Study​​

Deer Creek Watershed Study​​

Client: Parsons Owner: Metropolitan St. Louis Sewer District Year Completed: 2018

M3 Engineering is part of the team that is eliminating the Sanitary Sewer Overflows (SSOs) in the Deer Creek Watershed. The constructed SSOs are scheduled for elimination by 2033. The project area encompasses the defined Deer Creek sub area within the Lemay Service Area. The estimated construction cost is approximately $378 million. Engineering services required for this project include the design and preparation of plans, specifications, strip map (boundary surveys of parcels requiring MSD purchase), and easement documents for the construction of wet weather storage tanks or tunnels with pump stations and odor control, multiple sanitary relief sewer projects, and public and private I/I reduction projects. M3 Engineering is providing HYDRA and XP-SWMM modeling services on sanitary and combined sewers, field data collection for Private Inflow Reduction (PIR) and sewer design. The goal of PIR is to determine and eliminate sources of stormwater entering the sanitary system.

Projects - Waste Water