Water/Wastewater Services

  • Hydraulic Modeling (XP-SWMM, HYDRA)
  • Alignment Studies
  • Sewer Design
  • Inflow Infiltration Reduction
  • Private Inflow Reduction
  • Sanitary Sewer Evaluation Study (SSES)
  • Condition Assessment
  • Combined Sewer Separation
  • Pump Station Design
  • Force Main Design​

» waste water

Lemay Watershed Study​​ Client: Jacobs Engineering Owner: Metropolitan St. Louis Sewer District ​Year Completed:​​​ 2018 M3...
Bissell Watershed Study​​ ​​Client: Jacobs Engineering Owner: Metropolitan St. Louis Sewer District​ Year Completed: 2018 M3...
Deer Creek Watershed Study​​ Client: Parsons Owner: Metropolitan St. Louis Sewer District Year Completed: 2018 M3 Engineering is...
High Priority Force Main Assessment​​ Client: Pure Technologies Owner: Metropolitan St. Louis Sewer District Year Completed:​​​ 2015 M3 was...
Sandfort Creek Trunkmain Replacement Client: City of St. Charles, MO Owner: City of St. Charles, MO Year Completed: 2014 The City of St....
Meramec Tunnel Alignment Study Client: HDR, Inc. Owner: Metropolitan St. Louis Sewer District Year Completed: 2012   M3 Engineering...
Lower and Middle River Des Peres Control Systems Client: Jacobs Engineering Owner: Metropolitan St. Louis Sewer District Year Completed: 2018   M3...